Skip to content

Case Study: Connectors Now Lasting Over 50 Times Longer

non-BFM® connector with product leakage

[PLASTER] Problem Powder Contained On Sieve

A leading UK plaster manufacturer was having an issue with the flexible connectors on a vibrating sieve lasting only a week at a time before tearing, causing major dust leakage and requiring significant maintenance downtime.

Plaster is very fine and is difficult to contain, but since installing BFM® fittings, there are no dust leaks and the connectors have already lasted more than 50 times longer than the previous jubilee-clip fastened connectors.

The Challenge

The existing flexible sleeves connecting a vibratory feeder were made from corrugated rubber and fastened with traditional jubilee clips.

They leaked constantly, were wearing fast and had to be replaced weekly due to the jubilee clip causing chafing and tearing because of the continuous gyratory movement.

This poor fit and constant tearing of the flexible sleeve caused excessive dust leakage and considerable maintenance downtime to replace and clean up.

There were also health & safety compliance issues as the existing sleeves had no ATEX certification.

non-BFM® connector with product leakage

The BFM® Solution

BFM® Seeflex 040AS (anti-static) sleeves have been fitted to both the inlet and outlet to the vibratory feeder with great results.

To date, the BFM®connectors have lasted over 50 times longer than the previous jubilee-clip fastened sleeve, saving a huge amount of expense in both replacement connectors and downtime.

The extremely fine plaster powder has been contained in a sealed system, so there are no longer issues with dust leaks and associated clean-up.

The BFM®Seeflex 040AS connectors are also ATEX compliant, so combined with a cleaner, dust-free environment, they have reduced the number of health & safety concerns.

Graphic of BFM® connector and how it seals from the inside

Benefits Achieved

BFM® Explosion Resistant Icon in BlueExplosion Resistant

The BFM® fitting has been fully tested and ATEX certified to be used in potentially explosive dust areas, providing H&S compliance.

BFM® Reduced Downtime Icon in BlueReduced Downtime

No weekly sleeve replacements or constant dust clean-up means maintenance downtime has been eliminated. 

BFM® Improved Hygiene Icon in BlueImproved Hygiene

There is no more dust leakage, eliminating product loss and a much cleaner environment. 

BFM® Health & Safety Icon in BlueHealth & Safety

The easy installation process, reduced dust exposure and added explosion protection are all positive H&S outcomes for staff.

Here's what the client said about BFM®:

“Plaster is very fine and gets everywhere. It is difficult to contain, particularly when your connecting sleeve has holes in it! BFM® has been brilliant. The connector seals inside the spigot so it can’t chafe on the sharp edges and there are no jubilee clips to tear the fabric. It lasts for longer and best of all it doesn’t leak any dust.”

- Works Engineer

 

Case Study courtesy of BFM® Distributor ProSpare (United Kingdom) 

Keen to see how BFM® could transform your plant?

Get in touch and we can have a quick chat and arrange a no-obligation demo.